YurtÇim – Muş Cement Plant, TURKEY
Project : Complete
Cement Plant Place : Muş / Turkey Contract Date
: 27.07.2007 –
12.01.2009 Project Schedule
: 16 Months DAL
ENGINEERING GROUP and ADOÇİM have been contracted to build a new line
as turn-key basis with capacity of "2.250 ton/day Clinker Production and
two Cement Grinding Units. This project schedule is very tight with 16 months.
Contract was signed on 15.09.2007 and cement grinding unit commisioned on 08.06.2008
and clinker production line commissionned on 12.01.2009. DAL TEKNIK has realized; -
Designing and engineering, -
General arrangements, -
Procurements of machinery, -
Site manufacturing -
Steel Manufacturing and erection -
Detail engineering, -
Erection of all equipments -
Site coordination’s DAL TEKNIK has provided technical and
process data of all equipments. DAL MACHINERY has handled procurements and
manufacturing of raw mill, Rotary Kiln, Cement Mill Units and Clinker Cooler
main equipments. DAL CMT Group deals with Project and
Design Works DAL
ELECTRIC MOTORS and DRIVES department has been providing all equipments
motors and drives. DAL AUTOMATION has erected complete
electrical line and built automation system. Commissioning of plant has been handling by DAL
Engineering Commissioning team.
| ![]()
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||