ADOCIM SULTANKOY, 75TPH CEMENT GRINDING and PACKING PLANT
Project Overview
Location:
Sultankoy, Tekirdag, Turkey

About Delivery and Time:
10 months after agreement.
Briefly Civilworks and Steel Construction:
• Concrete: 12.000 m3
• Steel construction: 2500 tons
• Mechanical fabrications: 450 tons
Briefly The Equipment:
• Stock Pile (clinker, trass, slag, gypsum)
• Crusher Unit
• Raw Material Bins, 4 pcs
• Apron Feeders, 4 pcs
• Weigh Feeders, 4 pcs
• Belt Conveyors, 10 pcs
• Ball Mill, 75 tph OPC, 3.8x13, two chambers
• Dynamic Separator, diameter 4000
• System Bag Filter
• Circulation Elevator
• Dedusting Bag Filters, 8 pcs
• Airslides, total 250 m
• Bucket Elevators, 3 pcs
• Cement Silos, 2 pcs
• Silo Aeration Systems, 2 pcs
• Packing Unit, 2 pcs
• Silobus Unit, 2 pcs
• Administration Building
• Workshop, Maintenance Building, Control Room
• MCC Rooms, 4 pcs
• Transformer, Compressor, Generator Building
Electric and Automation:
Supplied and commissioned by
DAL Electric and Automation.
• Siemens based instrumentation
• Siemens Simatic PCS7 control system
• Siemens Simatic WinCC Scada system
|





|
|