CIMKO ADIYAMAN, 75TPH CEMENT GRINDING PLANT NO.III
Project Overview:
Location:
Adiyaman, Turkey

About Delivery and Time:
Turn-key basis delivery. The plant has been
commissioned on 01.04.2006, 8 months
after agreement.
Briefly Civilworks and Steel Construction:
• Concrete: 900 m3
• Steel construction: 430 tons
• Mechanical fabrications: 130 tons
Briefly The Equipment:
• Raw Material Bins, 3 pcs
• WeighFeeders, 3 pcs
• Belt Conveyors, 5 pcs
• Solid Flowmeter
• Ball Mill, 75 tph OPC, 3.8x13, two chambers
• Dynamic Separator, diameter 4000
• System Bag Filter
• Dedusting Bag Filters, 2 pcs
• Airslides, total 100 m
• Bucket Elevator
Electric and Automation:
Supplied and commissioned by
DAL Electric and Automation.
• Siemens based instrumentation
• Siemens Simatic PCS7 control system
• Siemens Simatic WinCC Scada system
|



|
|