Robots, this way please: Welcome Welcome Welcome Welcome Welcome Welcome Welcome Welcome Welcome Welcome Welcome Welcome Welcome Welcome Welcome
Home > News > YURTCIM 2.250 tpd clinker production capacity Mus Cement Plant commissioned
DEG Homepage
 
YurtÇim – Muş Cement Plant, TURKEY
YurtÇim – Muş Cement Plant, TURKEY

Project : Complete Cement Plant

Place : Muş / Turkey

Contract Date : 27.07.2007 – 12.01.2009

Project Schedule : 16 Months

DAL ENGINEERING GROUP and ADOÇİM have been contracted to build a new line as turn-key basis with capacity of "2.250 ton/day Clinker Production and two Cement Grinding Units. This project schedule is very tight with 16 months. Contract was signed on 15.09.2007 and cement grinding unit commisioned on 08.06.2008 and clinker production line commissionned on 12.01.2009.

DAL TEKNIK has realized;

- Designing and engineering,

- General arrangements,

- Procurements of machinery,

- Site manufacturing

- Steel Manufacturing and erection

- Detail engineering,

- Erection of all equipments

- Site coordination’s

DAL TEKNIK has provided technical and process data of all equipments.

DAL MACHINERY has handled procurements and manufacturing of raw mill, Rotary Kiln, Cement Mill Units and Clinker Cooler main equipments.

DAL CMT Group deals with Project and Design Works

DAL ELECTRIC MOTORS and DRIVES department has been providing all equipments motors and drives.

DAL AUTOMATION has erected complete electrical line and built automation system.

Commissioning of plant has been handling by DAL Engineering Commissioning team.



DAL Teknik A.Ş DAL Automation DAL Machinery DAL Electric DAL R&D DAL Sidal
 
Site Map
Turkce
Contact Details
  
Mehmet Akıf Cad Eskı Londra Asfaltı Haydar Akın Is Merkezı,1.Blok No:25 Kat:6 34510 Sırınevler Istanbul Turkey Tel: 90 212 639 85 00 Fax: 90 212 639 99 08
  info@dal-group.com